Final Project

 

Transcript:

 https://docs.google.com/document/d/1j1SeL0gp46W7ZmrhIy033FfpCedlHNswiuX5y52Qzrg/edit?usp=sharing


StoryMap:

https://arcg.is/G8LPa0


The transcript and StoryMap linked above explain an analysis I completed on the proposed transmission line for the Bobwhite-Manatee project by FPL. This analysis located any imposition of the transmission line on environmentally sensitive lands, located any imposition of the transmission line on homes in the study area, located any imposition of the transmission line on schools and daycares in the study area, and found the approximate length of the transmission line for engineering knowledge to address community, environmental, and engineering factors of the Project. Overall 7 maps were created and two other graphics. 

This final project was a very stressful and interesting experience for me. I realized how much I had just been blindly following the steps of past assignments because of this project. For a large portion of it, I felt like I actually had no idea what I was doing. Now that I'm finished though, map-making is really easy to me, and so is creating feature classes, editing attribute tables, digitizing, and using the intersect tool. I understand why the final is set up like this - it really makes you use what you know and apply everything you've done before. I learned a lot from this, but I also spent an insane amount of time on it, so I'm glad it's over. 


No comments:

Post a Comment

LULC in Relation to the Eutrophication of Lake Tahoe

  This map and graph show how the area of certain land cover classes has changed from 2006-2010 in the Lake Tahoe basin. Lake Tahoe has been...